Quick update with the most recent pictures and videos...
Pools are (almost) finished and the lights and waterfall features are amazing. Here is the upstairs pool:
Here is the pool on the ground floor (with the hurricane shutters in the background):
![](https://static.wixstatic.com/media/ea1304_3e34c6ad8ee14071a2acfce03febe84b~mv2.png/v1/fill/w_980,h_1742,al_c,q_90,usm_0.66_1.00_0.01,enc_auto/ea1304_3e34c6ad8ee14071a2acfce03febe84b~mv2.png)
Work is underway finishing built-in furniture and finalizing interior touches:
And finally - Starlink internet is up and running, and the generator is on-site and being installed to provide power in case of power outages.
Comments